CONNECTING THE WELL TO THE TANK
The next step in getting the well operational was connecting the well to the storage tank located on top of the hill at the house site. Jeff helped John our well guy lay pipe for the water and conduit for the float switch wire from the tank down through the ravine to the well.
The water pipe and conduit going through the ravine
John connecting the water pipe to the well
At the end of the day the control box was installed on the well and the pump successfully pumped water up to the storage tank. Now we are just waiting on the installation of the solar panels and we'll have a working water system.
A little Hedgehog cactus eye candy!



No comments:
Post a Comment